LogoATRIUM
ARRIVALLOBBYLIFTROOM

Atrium Architecture · Est. 2011

We design the building
your brand checks into.

From lobby threshold to rooftop parapet — shaping the geometry of arrival, the compression of corridors, and the release of light into every guest room.

Scroll to enter
01Arrival

Zone 01 — Arrival

Site strategy begins before the first column is placed.

We read the site before we read the program. Orientation, setback geometry, drop-off sequencing, and the relationship between public realm and hotel threshold — these decisions lock in the guest experience before construction documents begin.

New BuildAdaptive ReuseBrand ConversionRenovation
47+
Hotel projects
12
States
3,200+
Keys delivered

Site Plan — Schematic

LOBBYCORE
0 — 20M
New Build·Adaptive Reuse·Brand Conversion·Renovation·Select Service·Full Service·Boutique·Extended Stay·Resort·Urban Mixed-Use·Airport Hotel·Convention Hotel·New Build·Adaptive Reuse·Brand Conversion·Renovation·Select Service·Full Service·Boutique·Extended Stay·Resort·Urban Mixed-Use·Airport Hotel·Convention Hotel·
02Public

Zone 02 — Public

Lobby Plan — Typical Full-Service

ENTRYRECEPTIONLIFTS

The lobby is the brand's first physical sentence. We write it in ceiling height, material weight, and the time it takes light to cross the floor.

Public spaces that earn their square footage — every night, on every cover.

Lobby & Arrival Hall

Ceiling height calibrated to rack rate. The 24-foot lobby of a full-service property is not decorative — it is revenue strategy.

F&B and Restaurant

Acoustic separation, kitchen adjacency, and the sightline from bar to entrance that turns a hotel restaurant into a neighborhood destination.

Meeting & Event Spaces

Column-free spans, operable wall coordination, and the service corridor that never crosses the ballroom floor during a gala.

Hotel lobby with soaring ceiling and warm ambient lighting
Hotel restaurant interior with architectural ceiling detail
03Private

Zone 03 — Private

The guest floor plate is a machine for sleeping — and for justifying your ADR.

We design guest floors where the structural bay, the MEP chase, the wet wall stack, and the room mix are resolved simultaneously — not sequentially. A 28-foot structural bay that doesn't support your room typology costs you 8% in net rentable area across every floor.

340 SF
King Standard

Wet wall centered. Entry sequence creates compression before room release.

620 SF
King Suite

Separated living zone. Ceiling break at 9'6" marks threshold.

380 SF
Corner Accessible

ADA-compliant without sacrificing spatial quality. Roll-in shower at window.

1,100 SF
Penthouse

Double-height living. Parapet detail becomes interior architectural moment.

$180K–$420K
Typical per-key construction cost we work within
Up to 11%
Net rentable area recovered through bay optimization
+14 inches
Average ceiling height increase vs. comparable projects
04Back of House

Zone 04 — Back of House

The spaces guests never see determine the margins operators live with.

We've been in enough post-occupancy reviews to know: the expensive problems are never the lobby finishes. They're the service elevator that can't fit a queen mattress, the mechanical room that bleeds noise into the adjacent suite, and the loading dock that shares a curb cut with valet.

MEP
Mechanical, Electrical & Plumbing

We coordinate MEP routing before the structural grid is set — not after.

SRV
Service Circulation

Linen, laundry, and room service never cross a guest corridor. Ever.

LIFE
Life Safety & Egress

Stair placement that satisfies code without carving into rentable area.

TECH
Technology Infrastructure

Riser shafts sized for the next 15 years, not the current PMS system.

Building Section — Service vs. Guest

L5L4L3L2L1SERVICEGUEST ROOMS

Service and guest circulation separated at every floor. The amber line never crosses the grey zone.

05Rooftop

Zone 05 — Rooftop

The last parapet is the last detail. We design it knowing it's the first thing photographed.

Rooftop amenity programming adds 12–22% to ADR on properties where it's executed well. We've seen it fail when the structural engineer gets the transfer slab after the pool is already priced. We bring the disciplines together at the right moment.

12–22% ADR uplift on executed rooftop programs
Hotel rooftop pool deck with architectural parapet detail at dusk

Pool Deck

Structural transfer at L12. Waterproofing spec written for 30-year horizon.

Rooftop Bar

Egress, wind study, and liquor license setbacks resolved in schematic design.

Mechanical Penthouse

Equipment access without compromising parapet sight lines from the street.

Event Terrace

Live load for 100-person occupancy. Drainage that doesn't compromise the floor below.

Ready to engage?

Five questions. One score. A clear picture of where your project stands.

The Project Readiness Assessment takes 3 minutes and produces a one-page PDF with typical scope, fee structure range, and recommended next steps for your specific project type.

New York · Los Angeles · Chicago
hello@atriumarchitecture.com